East Tilbury School

Contract Profile

East Tilbury School

Project Overview

This project was to provide additional class rooms for East Tilbury school by installing modular buildings.

Bul 1 reduced the ground, constructed the new pad footings for the building to founded upon. The building was connected to the foul and surface water drainage system. We constructed a parking area consisting of precast concrete kerbs and asphalt finish. The footpaths to the new modular building were constructed of precast concrete paving slabs laid on a cement/sand bed.

Location: East Tilbury School, East Tilbury
Client: Modulere - AR
Main Contractor: Richard Morris Construction
Value: £250 thousand
Programme: 16 Weeks 

Scope: 

Infrastructure works consisting of the following:

1
2
3
4
5
6
7
3.25 / 2

GET IN TOUCH

Our vision is “to be leaders in the construction of a sustainable future”, and our core values are excellence, passion, integrity and collaboration. Our focus is Demonstrates knowledge and understanding of standards, policy and procedures in own area of work and that of the client. Maintains good systems and records. Acts as a role model to others.